| Manufacturing Industry |
|
Material Requirements Planning (MRP) |
$4000 |
80 |
|
Enterprise Resource Planning (ERP) |
$4000 |
80 |
|
Manufacturing Solutions (Integrated) |
$4000 |
80 |
|
Advanced Planning and Scheduling |
$4000 |
80 |
|
Inventory Management |
$4000 |
80 |
|
Capacity Requirements Planning (CRP) |
$4000 |
80 |
|
Shop Floor Control |
$4000 |
80 |
|
Engineer to Order/Make to Order |
$4000 |
80 |
|
Bill of Material (BOM) |
$4000 |
80 |
|
Manufacturing Execution Systems (MES) |
$4000 |
80 |
|
Supply Chain Management |
$4000 |
80 |
|
Warehouse Management Solutions |
$4000 |
80 |
|
Requisitioning and Procurement |
$4000 |
80 |
|
Trading Partner Management |
$4000 |
80 |
|
Material Management |
$4000 |
8/16/80 |
|
Warehouse Management |
$4000 |
8/16/80 |
|
Production Planning |
$4000 |
8/16/80 |
|
Value Chain Management |
$4000 |
8/16/80 |
|
Quality Management |
$4000 |
8/16/80 |
|
Six Sigma for Manufacturing |
$4000 |
8/16/80 |
|
Manugistics for Manufacturing |
$4000 |
8/16/80 |
|
i2 for Manufacturing |
$4000 |
8/16/80 |
|
SAP for Manufacturing and Logistics |
$4000 |
8/16/80 |
|
Lean Manufacturing |
$4000 |
8/16/80 |
|
Six Sigma |
$4000 |
8/16/80 |
|
Geometric Dimensioning |
$4000 |
8/16/80 |
|
Shop Floor Operator courses |
$4000 |
8/16/80 |
|
Managing Customer-Driven Quality Improvement |
$4000 |
8/16/80 |
|
Logistics Management |
$4000 |
8/16/80 |
|
Manufacturing Engineering skills upgrade |
$4000 |
8/16/80 |
|
Industrial Engineering skills upgrade |
$4000 |
8/16/80 |
|
How to Plan and Manage Warehouse Operations |
$4000 |
8/16/80 |
|
Fundamentals of Statistical Process Control |
$4000 |
8/16/80 |
|
How to Manage Maintenance |
$4000 |
8/16/80 |
|
Fundamentals of Inventory Management and Control |
$4000 |
8/16/80 |
|
Certificate in Manufacturing Management |
$4000 |
8/16/80 |
|
Surface Mount Technology Training |
$4000 |
8/16/80 |
| Clinical
Trials GCP Advanced |
$4000 |
8/16/80 |
|
Fiber Optics Training Courses |
$4000 |
8/16/80 |
|
Wireless Training |
$4000 |
8/16/80 |
|
Instrumentation Symbols |
$4000 |
8/16/80 |
|
Instrument Loop Diagrams |
$4000 |
8/16/80 |
|
Instrumentation Diagrams |
$4000 |
8/16/80 |
|
Feedback Control |
$4000 |
8/16/80 |
|
Process Control Modes |
$4000 |
8/16/80 |
|
Process Characteristics |
$4000 |
8/16/80 |
|
Achieving Production Stability: Foundation for Lean
Manufacturing |
$4000 |
8/16/80 |
|
Achieving Production Leveling |
$4000 |
8/16/80 |
|
Design of Pull Systems (Kanban) |
$4000 |
8/16/80 |
|
Continuous Flow: Eliminating Waste |
$4000 |
8/16/80 |
|
Failure Mode Effects Analysis |
$4000 |
8/16/80 |
|
Five Phases to Lean Manufacturing Implementation |
$4000 |
8/16/80 |
|
Global 8D (Problem Solving Process) |
$4000 |
8/16/80 |
|
Lean Manufacturing Fundamentals |
$4000 |
8/16/80 |
|
Planning Manufacturing Cells Fundamentals |
$4000 |
8/16/80 |
|
Standardized Work: Achieving Predictability through
Repeatability |
$4000 |
8/16/80 |
|
Value Stream Mapping and Analysis |
$4000 |
8/16/80 |
|
Shop Essentials |
$4000 |
8/16/80 |
|
CNC |
$4000 |
8/16/80 |
|
Materials |
$4000 |
8/16/80 |
|
Workholding |
$4000 |
8/16/80 |
|
Metal Cutting |
$4000 |
8/16/80 |
| Stamping |
$4000 |
8/16/80 |
|
EDM |
$4000 |
8/16/80 |
|
Quality |
$4000 |
8/16/80 |